Update, Minutiae

Alright, things appear to be a little slow right now.  We’re getting little nit picky things in order at the moment, so progress feels slow.

We’ve designed some shelves to surround the murphy bed.  We’ve designed the greenhouse and how it holds together.  We’ve figured out that the big window needs to move 3 inches.  So, not much is new.  But here you go… Well, the drywall in the top half is new, so that’s something!

20101117-305-39889

20101117-305-39884

20101117-305-39883

20101117-305-39888

The loft, with some storage nooks.

 

20101117-305-39890

The storage area by the greenhouse.

 

20101117-305-39891

Lots of pipes for pool plumbing.

This entry was posted in Uncategorized and tagged , . Bookmark the permalink. Trackbacks are closed, but you can post a comment.

Post a Comment

Your email is never published nor shared. Required fields are marked *

*
*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>