Footers, in place

That’s right. Now we even have concrete in the footers. Very exciting. Hopefully this week includes concrete block, and maybe even some gravel in the foundation.

20100926-292-38314
20100926-292-38312
20100926-292-38310
This entry was posted in Uncategorized. Bookmark the permalink. Trackbacks are closed, but you can post a comment.

2 Comments